SMART TUNNEL
(Stormwater Management And
RoadTunnel)
PRESENTED BY : SAQIB MAHAL
REG NO. : 14-CE-63
UET TAXILA
SMART
TUNNEL
SMART TUNNEL
• The "Storm water Management And Road Tunnel" or "SMART
Tunnel", is a storm drainage and road structure in Kuala Lumpur,
Malaysia, and a major national project in the country.
• The 9.7 km (6.0 mi) tunnel is the longest storm water tunnel in South
East Asia and second longest in Asia. . It is the longest multi-purpose
tunnel in the world
• The main objective of this tunnel is to solve the problem of flash floods
in Kuala Lumpur and also to reduce traffic jams during rush hour.
• There are two components of this tunnel, the storm water tunnel and
motorway tunnel.
ROUTE
It begins at Kampung
Berembang lake near
Klang River at Ampang
and ends at Taman Desa
lake near Kerayong River
at Salak South.
HISTORY
• In 2001 the Government sought proposals for a solution that would
allow a typical flood of three to six hours’ duration to occur without
flooding the city center. A tunnel that would allow floods to bypass the
center was one way of achieving this, providing it was coupled with
temporary storage facilities to keep flows downstream of Kuala
Lumpur within the capacity of the river channel.
• A group led by Gamuda engaged SSP, a large Malaysian consultant
engineering firm, and Mott MacDonald UK to develop proposals for a
tunnel with holding ponds at upstream and downstream ends of the
tunnel.
• Construction of the tunnel began in 25 November 2003.
CONSTRUCTION
OF SMART
TUNNEL
CONSTRUCTION
• Two Tunnel Boring Machines (TBM) from Germany manufactured by
Herrenknecht were used, including "Tuah" on north side and
"Gemilang" on south side.
• Gusztáv Klados was the senior project manager of the project.
• The motorway sections on the SMART system was officially opened at
3:00PM, 14 May 2007.
• Meanwhile, the storm water sections on the SMART system began
operations at the end of January 2007.
• As of 18 July 2010 the SMART system has prevented seven potentially
disastrous flash floods in the city center.
How the
SMART Tunnel
works?
• The first mode, under normal
conditions where there is no
storm, no flood water will be
diverted into the system.
Mode 1:
No storm,
low
rainfall
• When the second mode is activated,
flood water is diverted into the
bypass tunnel underneath the
motorway tunnel. The motorway
section is still open to traffic at this
stage
Mode 2:
Moderate
storm
• When the third mode is in operation, the
motorway will be closed to all traffic. After
making sure all vehicles have exited the
motorway, automated water-tight gates will
be opened to allow flood waters to pass
through. The motorway will be reopened to
traffic within 48 hours of closure.
Mode 3:
Major
storm
TECHNICAL
SPECIFICATIONS
OF SMART
TUNNEL
The north bound entrance of SMARTTunnel on the
Kuala Lumpur-Seremban Expressway.
Stormwater tunnel
• Construction cost: US$ 514.6 million
• Stormwater tunnel length: 9.7 km (6.0 mi)
• Diameter: 13.2 m (43.3 ft.) (outer diameter)
• Tunneling method: Tunnel Boring Machine (TBM)
• TBM type: Slurry shield
Slurry Shield TBM
• Slurry shields are TBM fitted with a
full face cutter head which provides
face support by pressurizing boring
fluid inside the cutter head chamber.
• These machines are most suited for
tunnels through unstable material
subjected to high groundwater pressure
or water inflow that must be stopped by
supporting the face with a boring fluid
subjected to pressure.
Motorway tunnel
• Motorway tunnel length: 4 km (2.5 mi)
• Structure type: Double Deck
• Ingress and egress: 1.5 km (0.93 mi) at Jalan Sultan Ismail and Jalan
Imbi
• Length: 1.4 km (0.87 mi) at Jalan Tun Razak
• Links: 1.6 km (0.99 mi) at Kuala Lumpur-Seremban Expressway
Links: City Centre near Kg. Pandan Roundabout KL-Seremban
Expressway near Sungai Besi Airport
FEATURES OF SMART TUNNEL
• Longest tunnel in Malaysia.
• 9.7 km (6.03 miles) stormwater by-pass tunnel.
• 4 km (2.49 miles) double-deck motorway within stormwater tunnel.
• The motorway tunnel is suitable for light vehicles only. Motorcycles
and heavy vehicles are not allowed.
• Ingress and egress connections to the motorway tunnel linking the
southern gateway to the city center.
FEATURES OF SMART TUNNEL (cont.)
• Holding basin complete with diversion and tunnel intake structures.
• Storage reservoir and a twin-box culvert to release flood discharge.
• State-of-the-art operations control room equipped with the latest
systems in operations management, surveillance and maintenance of
the SMART system.
• Custom-made fire engine units consisting of two modified Toyota
Hiluxes, parked at two different locations for quick access to the tunnel
in case of fire on both carriageways.
CCTV
monitoring of
SMART Tunnel
TOLLS
CLASS TYPE OF VEHICLES Rate
(in Malaysian ringgit (RM))
1 Private cars RM 3.00
2 Taxis RM 3.00
 SMART Tunnel toll plaza has now fully Electronic Toll
Collections (ETC)
 As part of an initiative to facilitate faster transaction at the
SMART Tunnel Toll Plaza, all toll transactions at this toll plaza
on the SMART Tunnel has now conducted electronically via
Touch 'n Go cards or SmartTAGs starting 9 September 2015.
FM Radio channels available in the tunnel
Radio Frequencies
Nasional FM 87.7 MHz
KL FM 97.2 MHz
Radio Klasik FM 95.3 MHz
Hot FM 97.6 MHz
Fly FM 95.8 MHz
hitz.fm 92.9 MHz
Traxx FM 90.3 MHz
BFM 89.9 89.9 MHz

More Related Content

What's hot

DMRC REPORT ON UNDERGROUND CONSTRUCTION
DMRC REPORT ON UNDERGROUND CONSTRUCTIONDMRC REPORT ON UNDERGROUND CONSTRUCTION
DMRC REPORT ON UNDERGROUND CONSTRUCTION
Md Shadab
 

What's hot (20)

Unconsolidated Undrained Test
Unconsolidated Undrained TestUnconsolidated Undrained Test
Unconsolidated Undrained Test
 
bs:copbs101
bs:copbs101bs:copbs101
bs:copbs101
 
Spun pile
Spun pileSpun pile
Spun pile
 
Soil nailing
Soil nailingSoil nailing
Soil nailing
 
Building technology 1 "Industrialized Building System" IBS
Building technology 1 "Industrialized Building System" IBSBuilding technology 1 "Industrialized Building System" IBS
Building technology 1 "Industrialized Building System" IBS
 
DMRC REPORT ON UNDERGROUND CONSTRUCTION
DMRC REPORT ON UNDERGROUND CONSTRUCTIONDMRC REPORT ON UNDERGROUND CONSTRUCTION
DMRC REPORT ON UNDERGROUND CONSTRUCTION
 
Blockwork system
Blockwork systemBlockwork system
Blockwork system
 
DELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRC
DELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRCDELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRC
DELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRC
 
Presentation on Underground metro.
Presentation on Underground metro.Presentation on Underground metro.
Presentation on Underground metro.
 
Building Services: Project 1
Building Services: Project 1Building Services: Project 1
Building Services: Project 1
 
Probe machintosh
Probe machintoshProbe machintosh
Probe machintosh
 
Soldier Bored and Diaphragm
Soldier Bored and DiaphragmSoldier Bored and Diaphragm
Soldier Bored and Diaphragm
 
Automated Tunnel Monitoring System (ATMS)
Automated Tunnel Monitoring System (ATMS)Automated Tunnel Monitoring System (ATMS)
Automated Tunnel Monitoring System (ATMS)
 
Building services
Building services Building services
Building services
 
7. TUNNEL ENGINEERING
7. TUNNEL ENGINEERING7. TUNNEL ENGINEERING
7. TUNNEL ENGINEERING
 
Standard Penetration Test
Standard Penetration TestStandard Penetration Test
Standard Penetration Test
 
Ventilation in tunnels
Ventilation in tunnelsVentilation in tunnels
Ventilation in tunnels
 
Spot Speed Study (Lab)
Spot Speed Study (Lab)Spot Speed Study (Lab)
Spot Speed Study (Lab)
 
Diaphragm wall: Construction and Design
Diaphragm wall: Construction and DesignDiaphragm wall: Construction and Design
Diaphragm wall: Construction and Design
 
Intelligent building
Intelligent buildingIntelligent building
Intelligent building
 

Viewers also liked

Drainage system
Drainage systemDrainage system
Drainage system
Nikhil Jp
 
Sustainable Stormwater Management
Sustainable Stormwater Management Sustainable Stormwater Management
Sustainable Stormwater Management
Shane Ah
 
Most recent discoveries in the feild of Construction engineering.
Most recent discoveries in the feild of Construction engineering.Most recent discoveries in the feild of Construction engineering.
Most recent discoveries in the feild of Construction engineering.
Faisal Rasool
 
Sem 2 bs1 storm water system
Sem 2 bs1 storm water systemSem 2 bs1 storm water system
Sem 2 bs1 storm water system
Est
 

Viewers also liked (20)

Stormwater management presentation slides
Stormwater management presentation slidesStormwater management presentation slides
Stormwater management presentation slides
 
Storm water drainage
Storm water drainageStorm water drainage
Storm water drainage
 
Drainage system
Drainage systemDrainage system
Drainage system
 
Sustainable Stormwater Management
Sustainable Stormwater Management Sustainable Stormwater Management
Sustainable Stormwater Management
 
Most recent discoveries in the feild of Construction engineering.
Most recent discoveries in the feild of Construction engineering.Most recent discoveries in the feild of Construction engineering.
Most recent discoveries in the feild of Construction engineering.
 
Smart Highways
Smart HighwaysSmart Highways
Smart Highways
 
House Drainage System
House Drainage SystemHouse Drainage System
House Drainage System
 
Construction of bukit berapit twin bore pipe arch tunnel
Construction of bukit berapit twin bore pipe arch tunnelConstruction of bukit berapit twin bore pipe arch tunnel
Construction of bukit berapit twin bore pipe arch tunnel
 
Canada: BC: Stormwater Planning Guidebook
Canada: BC: Stormwater Planning GuidebookCanada: BC: Stormwater Planning Guidebook
Canada: BC: Stormwater Planning Guidebook
 
Mechanisms and mitigation of highway landslide collapse in indiana by by Male...
Mechanisms and mitigation of highway landslide collapse in indiana by by Male...Mechanisms and mitigation of highway landslide collapse in indiana by by Male...
Mechanisms and mitigation of highway landslide collapse in indiana by by Male...
 
SMART TUNNEL
SMART TUNNELSMART TUNNEL
SMART TUNNEL
 
F2 Drainage of golf course features
F2 Drainage of golf course featuresF2 Drainage of golf course features
F2 Drainage of golf course features
 
Hydraulics of structures
Hydraulics of structuresHydraulics of structures
Hydraulics of structures
 
Flash floods caused by clogging
Flash floods caused by cloggingFlash floods caused by clogging
Flash floods caused by clogging
 
weirs
weirsweirs
weirs
 
Rainwater harvesting in Chandigarh_Architect Surinder Bahga_August 19, 2015
Rainwater harvesting in Chandigarh_Architect Surinder Bahga_August 19, 2015Rainwater harvesting in Chandigarh_Architect Surinder Bahga_August 19, 2015
Rainwater harvesting in Chandigarh_Architect Surinder Bahga_August 19, 2015
 
Group 5 1
Group 5 1Group 5 1
Group 5 1
 
Sem 2 bs1 storm water system
Sem 2 bs1 storm water systemSem 2 bs1 storm water system
Sem 2 bs1 storm water system
 
EMAS - Engineered Material Arrestor System (seminar ppt)
EMAS - Engineered Material Arrestor System (seminar ppt) EMAS - Engineered Material Arrestor System (seminar ppt)
EMAS - Engineered Material Arrestor System (seminar ppt)
 
Sewerage System (Sistem Perpipaan Air Limbah)
Sewerage System (Sistem Perpipaan Air Limbah)Sewerage System (Sistem Perpipaan Air Limbah)
Sewerage System (Sistem Perpipaan Air Limbah)
 

Similar to Smart tunnel

SMART tunnel report
SMART tunnel reportSMART tunnel report
SMART tunnel report
Yap Xin
 
Malaysia Logistics
Malaysia LogisticsMalaysia Logistics
Malaysia Logistics
YAU MEE LIM
 

Similar to Smart tunnel (20)

Smart tunnel
Smart  tunnelSmart  tunnel
Smart tunnel
 
SMART (Stormwater Management And Road Tunnel) (1).pptx
SMART (Stormwater Management And Road Tunnel) (1).pptxSMART (Stormwater Management And Road Tunnel) (1).pptx
SMART (Stormwater Management And Road Tunnel) (1).pptx
 
Building Services assignment 1
Building Services assignment 1Building Services assignment 1
Building Services assignment 1
 
SMART tunnel report
SMART tunnel reportSMART tunnel report
SMART tunnel report
 
MRT TRANSPORTATION
MRT TRANSPORTATION MRT TRANSPORTATION
MRT TRANSPORTATION
 
348
348348
348
 
IRJET- Storm Water Management and Road Tunnel
IRJET- Storm Water Management and Road TunnelIRJET- Storm Water Management and Road Tunnel
IRJET- Storm Water Management and Road Tunnel
 
BS ASSIGNMENT
BS ASSIGNMENTBS ASSIGNMENT
BS ASSIGNMENT
 
Building Service Assignment
Building Service Assignment Building Service Assignment
Building Service Assignment
 
USBRL Railway Project Presentation
USBRL Railway Project PresentationUSBRL Railway Project Presentation
USBRL Railway Project Presentation
 
Rapid KL Transport System
Rapid KL Transport System Rapid KL Transport System
Rapid KL Transport System
 
Kashmir rail project
Kashmir rail projectKashmir rail project
Kashmir rail project
 
CMRL - Urban Design Analysis
CMRL - Urban Design AnalysisCMRL - Urban Design Analysis
CMRL - Urban Design Analysis
 
internship report on NJHPP
internship report on NJHPPinternship report on NJHPP
internship report on NJHPP
 
Atal Rohtang Tunnel - construction process ,challenges and features
Atal Rohtang Tunnel - construction process ,challenges and featuresAtal Rohtang Tunnel - construction process ,challenges and features
Atal Rohtang Tunnel - construction process ,challenges and features
 
Urban presentation
Urban presentationUrban presentation
Urban presentation
 
Malaysia Logistics
Malaysia LogisticsMalaysia Logistics
Malaysia Logistics
 
Kashmirrailproject
KashmirrailprojectKashmirrailproject
Kashmirrailproject
 
NHAI-E-Coffee-Table.pdf
NHAI-E-Coffee-Table.pdfNHAI-E-Coffee-Table.pdf
NHAI-E-Coffee-Table.pdf
 
INTELLIGENT TRANSPORTATION SYSTEMS
INTELLIGENT TRANSPORTATION SYSTEMSINTELLIGENT TRANSPORTATION SYSTEMS
INTELLIGENT TRANSPORTATION SYSTEMS
 

Recently uploaded

AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Dr.Costas Sachpazis
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Christo Ananth
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 

Recently uploaded (20)

The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 

Smart tunnel

  • 1. SMART TUNNEL (Stormwater Management And RoadTunnel) PRESENTED BY : SAQIB MAHAL REG NO. : 14-CE-63 UET TAXILA
  • 3. SMART TUNNEL • The "Storm water Management And Road Tunnel" or "SMART Tunnel", is a storm drainage and road structure in Kuala Lumpur, Malaysia, and a major national project in the country. • The 9.7 km (6.0 mi) tunnel is the longest storm water tunnel in South East Asia and second longest in Asia. . It is the longest multi-purpose tunnel in the world • The main objective of this tunnel is to solve the problem of flash floods in Kuala Lumpur and also to reduce traffic jams during rush hour. • There are two components of this tunnel, the storm water tunnel and motorway tunnel.
  • 4. ROUTE It begins at Kampung Berembang lake near Klang River at Ampang and ends at Taman Desa lake near Kerayong River at Salak South.
  • 5. HISTORY • In 2001 the Government sought proposals for a solution that would allow a typical flood of three to six hours’ duration to occur without flooding the city center. A tunnel that would allow floods to bypass the center was one way of achieving this, providing it was coupled with temporary storage facilities to keep flows downstream of Kuala Lumpur within the capacity of the river channel. • A group led by Gamuda engaged SSP, a large Malaysian consultant engineering firm, and Mott MacDonald UK to develop proposals for a tunnel with holding ponds at upstream and downstream ends of the tunnel. • Construction of the tunnel began in 25 November 2003.
  • 7. CONSTRUCTION • Two Tunnel Boring Machines (TBM) from Germany manufactured by Herrenknecht were used, including "Tuah" on north side and "Gemilang" on south side. • Gusztáv Klados was the senior project manager of the project. • The motorway sections on the SMART system was officially opened at 3:00PM, 14 May 2007. • Meanwhile, the storm water sections on the SMART system began operations at the end of January 2007. • As of 18 July 2010 the SMART system has prevented seven potentially disastrous flash floods in the city center.
  • 9. • The first mode, under normal conditions where there is no storm, no flood water will be diverted into the system. Mode 1: No storm, low rainfall
  • 10. • When the second mode is activated, flood water is diverted into the bypass tunnel underneath the motorway tunnel. The motorway section is still open to traffic at this stage Mode 2: Moderate storm
  • 11. • When the third mode is in operation, the motorway will be closed to all traffic. After making sure all vehicles have exited the motorway, automated water-tight gates will be opened to allow flood waters to pass through. The motorway will be reopened to traffic within 48 hours of closure. Mode 3: Major storm
  • 12. TECHNICAL SPECIFICATIONS OF SMART TUNNEL The north bound entrance of SMARTTunnel on the Kuala Lumpur-Seremban Expressway.
  • 13. Stormwater tunnel • Construction cost: US$ 514.6 million • Stormwater tunnel length: 9.7 km (6.0 mi) • Diameter: 13.2 m (43.3 ft.) (outer diameter) • Tunneling method: Tunnel Boring Machine (TBM) • TBM type: Slurry shield
  • 14. Slurry Shield TBM • Slurry shields are TBM fitted with a full face cutter head which provides face support by pressurizing boring fluid inside the cutter head chamber. • These machines are most suited for tunnels through unstable material subjected to high groundwater pressure or water inflow that must be stopped by supporting the face with a boring fluid subjected to pressure.
  • 15. Motorway tunnel • Motorway tunnel length: 4 km (2.5 mi) • Structure type: Double Deck • Ingress and egress: 1.5 km (0.93 mi) at Jalan Sultan Ismail and Jalan Imbi • Length: 1.4 km (0.87 mi) at Jalan Tun Razak • Links: 1.6 km (0.99 mi) at Kuala Lumpur-Seremban Expressway Links: City Centre near Kg. Pandan Roundabout KL-Seremban Expressway near Sungai Besi Airport
  • 16. FEATURES OF SMART TUNNEL • Longest tunnel in Malaysia. • 9.7 km (6.03 miles) stormwater by-pass tunnel. • 4 km (2.49 miles) double-deck motorway within stormwater tunnel. • The motorway tunnel is suitable for light vehicles only. Motorcycles and heavy vehicles are not allowed. • Ingress and egress connections to the motorway tunnel linking the southern gateway to the city center.
  • 17. FEATURES OF SMART TUNNEL (cont.) • Holding basin complete with diversion and tunnel intake structures. • Storage reservoir and a twin-box culvert to release flood discharge. • State-of-the-art operations control room equipped with the latest systems in operations management, surveillance and maintenance of the SMART system. • Custom-made fire engine units consisting of two modified Toyota Hiluxes, parked at two different locations for quick access to the tunnel in case of fire on both carriageways.
  • 19. TOLLS CLASS TYPE OF VEHICLES Rate (in Malaysian ringgit (RM)) 1 Private cars RM 3.00 2 Taxis RM 3.00  SMART Tunnel toll plaza has now fully Electronic Toll Collections (ETC)  As part of an initiative to facilitate faster transaction at the SMART Tunnel Toll Plaza, all toll transactions at this toll plaza on the SMART Tunnel has now conducted electronically via Touch 'n Go cards or SmartTAGs starting 9 September 2015.
  • 20. FM Radio channels available in the tunnel Radio Frequencies Nasional FM 87.7 MHz KL FM 97.2 MHz Radio Klasik FM 95.3 MHz Hot FM 97.6 MHz Fly FM 95.8 MHz hitz.fm 92.9 MHz Traxx FM 90.3 MHz BFM 89.9 89.9 MHz